Acıbadem Project Management Prefered CelluBOR
In the construction of Acıbadem Hospital Maslak Building, which was constructed by Acıbadem Project Management, for the steel bridge thermal and sound insulation between the various places inside the building and the two buildings, CelluBOR was preffered.
CelluBOR, besides its qualified thermal and sound insulation values, provides extra protection to steel structural elements due to its anti-corrosive properties. CelluBOR, an ecological insulation material, continues to be the leading choice for hospital and hotel projects, as it holds anti-bacterial features at the same time.